Cascade Hydropower Stations under construction, in Nam Ou River basin, Laos
There will be seven cascade hydropower projects developed in the Nam Ou River basin, with a total installed capacity of 1,156 MW. The construction work started on Oct 1, 2012.
An artist's drawing of hydropower Cascades II, V, and VI in the Nam Ou River Basin。