无码中文字幕一Av王,91亚洲精品无码,日韩人妻有码精品专区,911亚洲精选国产青草衣衣衣

English 中文網 漫畫網 愛新聞iNews 翻譯論壇
中國網站品牌欄目(頻道)
當前位置: Language Tips > 每日播報

Concerns over radiation remain

[ 2012-03-12 10:33]     字號 [] [] []  
免費訂閱30天China Daily雙語新聞手機報:移動用戶編輯短信CD至106580009009

Download

One year after the nuclear meltdown in Fukushima, a coastal prefecture in northeastern Japan, concerns still remain globally and nationally over radiation.

The accident occurred after a 9.0-magnitude earthquake on March 11, 2011, triggered a tsunami, flooding the Fukushima Daiichi nuclear power plant. Cooling devices inside the plant malfunctioned, causing the meltdown.

TEPCO, the owner of the plant, became the target of public frustration after the disaster andhas been bombarded by the media over the last year.

The Japanese government has created a 20-km "no-go-zone" around the plant. Unlicensed vehicles and people are not allowed to enter. A group of teachers from Fukuoka Prefecture in Southwest Japan visited one of the major checking posts south of the plant on Saturday.

One of the teachers told China Daily that people in her town are still worried about radiation exposure.

Another female teacher used a monitoring device to measure the radiation level outside the plant. It showed that the radiation level was higher just above the surface of the ground.

Fukushima Prefecture's Futaba County, home to the Fukushima Daiichi and Daini nuclear power plants, has suffered serious soil contamination because of the radiation.

Japanese Environment Minister Goshi Hosono delivered a proposal on Saturday suggesting the construction of three transitional storage facilities in three different towns to contain the polluted soil.

A disposal site has also been proposed to be built to store ash after the debris is burned.

The compensation process is underway as TEPCO's president promised on Friday to expand compensation to include more homeless people.

Analysts said the tragedy may have been "preventable", as TEPCO should have protected the Daiichi plant's emergency power supplies by moving them to higher ground or by placing them in waterproof bunkers.

Even though the cooling device and diesel generators broke down, the plant should have utilized a prepared backup water container that requires no additional power or steam to cooldown the reactors "within the first hour and a half", said a researcher with Japan Atomic Energy Agency.

Moreover, Tokyo's failure to follow international safety standards and previous lessons of nuclear disclosures contributed to the accident, Washington-based think tank Carnegie Foundation said in a report on March 6.

Questions:

1. What magnitude was the earthquake?

2. How far is the ‘no-go-zone’ around the plant?

3. What did TEPCO’s president promise to expand on Friday?

Answers:

1. 9.0.

2. 20 km.

3. Compensation to include more homeless people.

(中國日報網英語點津 Helen 編輯)

Concerns over radiation remain

About the broadcaster:

Concerns over radiation remain

Emily Cheng is an editor at China Daily. She was born in Sydney, Australia and graduated from the University of Sydney with a degree in Media, English Literature and Politics. She has worked in the media industry since starting university and this is the third time she has settled abroad - she interned with a magazine in Hong Kong 2007 and studied at the University of Leeds in 2009.

 
中國日報網英語點津版權說明:凡注明來源為“中國日報網英語點津:XXX(署名)”的原創(chuàng)作品,除與中國日報網簽署英語點津內容授權協(xié)議的網站外,其他任何網站或單位未經允許不得非法盜鏈、轉載和使用,違者必究。如需使用,請與010-84883631聯(lián)系;凡本網注明“來源:XXX(非英語點津)”的作品,均轉載自其它媒體,目的在于傳播更多信息,其他媒體如需轉載,請與稿件來源方聯(lián)系,如產生任何問題與本網無關;本網所發(fā)布的歌曲、電影片段,版權歸原作者所有,僅供學習與研究,如果侵權,請?zhí)峁┌鏅嘧C明,以便盡快刪除。
 

關注和訂閱

人氣排行

翻譯服務

中國日報網翻譯工作室

我們提供:媒體、文化、財經法律等專業(yè)領域的中英互譯服務
電話:010-84883468
郵件:translate@chinadaily.com.cn